top of page

Frequently asked questions
General
Industrial waste heat recovery captures heat that would otherwise be vented or lost from a manufacturing process — such as exhaust air from a kiln, furnace, dryer, or cooling process — and reuses it elsewhere on site. This cuts the amount of primary fuel (usually gas) a plant needs to buy, lowering both energy costs and carbon emissions without changing the core production process.
Rather than just recirculating waste heat directly, a heat pump upgrades low-grade waste heat to a higher, more useful temperature — for example, taking warm exhaust air and lifting it to a temperature suitable for process heating such as drying. This means heat that's too cool to reuse on its own can still be captured and put to work.
Heavy energy users with continuous thermal processes see the strongest returns — particularly heavy clay, ceramics, and precast concrete manufacturing, where kilns and curing/drying processes generate large, consistent volumes of waste heat. The same principles increasingly apply to other sectors with high heat demand, including healthcare estates moving off gas boilers as part of decarbonisation plans.
Payback varies by site, process, and how much waste heat is available to capture, but industrial waste heat recovery projects typically deliver faster returns than most other decarbonisation measures because they reduce a real, ongoing fuel cost rather than just adding new equipment. A heat recovery study is the only reliable way to get an estimate of specific payback figure — get in touch and we can scope this for you.
Waste heat recovery and industrial heat pump technology is well established and already operating at commercial scale across UK manufacturing sites. Heatcatcher's systems are engineered around each site's specific process conditions rather than off-the-shelf, so performance is validated for your application before installation, not assumed.
Yes — government and industry funding schemes for industrial decarbonisation change fairly often, so it's worth checking current eligibility rather than relying on older information.
Projects are planned around your production schedule, with installation phased to minimise downtime — in many cases work can be carried out without stopping the process line at all. This is scoped in detail during the front-end engineering design stage, before any work begins on site.
It starts with a site visit and process review to understand where heat is currently being lost, how much is recoverable, and what it could realistically be used for on your site. This forms the basis of a heat recovery study with projected savings, payback, and a proposed system design — get in touch to arrange a visit.
Yes — this is a specialist area, and it's what we focus on. High-temperature and process-specific applications need systems engineered around the actual heat source and demand profile, rather than a standard commercial heat pump, which is where our engineering background comes in.
Systems are designed for reliable, low-intervention operation, with monitoring in place to track performance against expected savings. Ongoing metering and monitoring also identifies further process optimisation opportunities not available prior to installation of the heat recovery system.
Recovering and reusing waste heat directly reduces the fuel in its boilers and burners, which lowers Scope 1 emissions and supports reporting requirements such as SECR and ESOS, as well as broader Net Zero commitments. For many industrial sites it's one of the most cost-effective decarbonisation measures available, because it reduces demand rather than just switching supply.
Heatcatcher was founded specifically to solve industrial waste heat recovery problems, with a team of multiple discipline engineers, experts in the application of best available technologies. With every system designed around the specific process, providing an independent approach to integrating a heat pump technology that provides the best technical and economic result .
bottom of page